Work Party Sat. 11-14-26
Work party Saturday Nov. 14 starting at 11ish – right after the 100-yard rimfire match
Project 1 – Repair the two older structures over the concrete benches down toward the pistol area
Project 2 – replacing the picnic tables “planking” with the new ones provided to us under warranty and rearranging under the Semi-Trailer so we can store the old planks.
Project 3 – General clean up and minor weed removal on both ranges
General hand tools, yard tools and battery-operated drills would be helpful.
